The renovation
The documented project includes envelope insulation, solar PV with battery storage and a new plant room with a groundwater-source heat pump, alongside centralised domestic hot water.

In an apartment building, change becomes part of everyday life. This project in Aosta shows how Donatello supported shared decisions, discussions with technical professionals and the integration of energy services.
Renovating an occupied building means balancing comfort, different needs, construction schedules and responsibilities. The project covered insulation, roofing, systems and accessibility: decisions to explain to residents and follow through practical difficulties.
As the building’s property manager, Donatello coordinated discussions with co-owners, the contractor and professionals, gathered documents and requested checks. Design, works supervision and construction remain the responsibilities of the appointed specialists.
The documented project includes envelope insulation, solar PV with battery storage and a new plant room with a groundwater-source heat pump, alongside centralised domestic hot water.
Donatello brought shared services onto the meter connected to the PV system, allowing the transferred loads to use electricity generated on site.
Bills, heat cost allocator readings and PV monitoring are considered together, distinguishing grid purchases, generation and the allocation units recorded for individual homes.
The property manager’s November 2024 report places most of the main works between December 2022 and December 2023.
The final bill records the end of supply on 31 January 2024, a documented step in the electrification process.
November 2024 is the last available bill with two meters; from December, one appears. This confirms a change in billing scope, but does not by itself establish the date of the physical connection.
Donatello requests before-and-after energy certificates, compliance documents, commissioning records and a joint site inspection before closure. The request documents his oversight; it does not establish that every document was delivered.
Heat cost allocators record heating allocation units in homes, not kWh. Electricity bills measure grid imports, excluding self-consumed solar generation. Centralised hot water and the consolidation of meters also change the scope of comparison.
Recent electricity imports have increased compared with the preceding period. Interpretation requires checks on weather, use, solar generation and storage availability. Savings assessment is ongoing: this case study does not assign the project a percentage reduction in costs or emissions.
The value of this work lies in connecting decisions, people and systems, and continuing to ask questions when the data changes. Donatello brings this experience to NOAH’s building consultancy, giving shared decisions an understandable and verifiable foundation.
Sources: system specifications updated on 31 October 2023; the property manager’s November 2024 report; January 2025 correspondence; bills and monitoring data reviewed in September 2026. The case is anonymised; source documents and personal data are not published.